A construction daily site report app on Microsoft 365 lets the site manager record the day on a phone: weather, who was on site, work done, deliveries, delays and photos. When they submit it, a Power Automate flow builds a PDF report and emails it to the project manager and the office, and every report is kept against the project for later.
On many sites the daily diary is written from memory on Friday, or not at all. It is the record you need most when a delay claim or a dispute comes up months later.
What goes in a daily site report?
| Section | What is recorded |
|---|---|
| Weather | Conditions and any time lost to weather |
| Labour | Own crew and subcontractors on site, with headcount |
| Work done | Progress by area or activity |
| Deliveries | What arrived, from whom, any problems |
| Delays and issues | What held work up, and who was told |
| Visitors and instructions | Client visits, inspector visits, site instructions received |
| Photos | Progress and anything worth evidence |
The list should match how your contracts are run. Keep the sections as data, so the office can change them without a developer.
How does the site manager fill it in?
They open today's report for their site and add to it through the day, rather than writing it all at the end. Labour can be pulled from the timesheet app if you use one, so headcount is not typed twice. Photos are taken in the app and attached to the right section.
At the end of the day they review it and submit. Submitted reports are locked, which matters if the report is ever used as evidence.
What happens after submission?
A flow builds a PDF from the report with the photos, saves it in the project's SharePoint folder, and emails it to the project manager and anyone else on the list. A scheduled flow checks each evening for sites with no report and reminds the site manager.
Safety issues raised in the report can go to the safety process. How incidents are escalated is covered in How to Escalate HSE Incidents Automatically with Power Automate.
What does the office get?
A daily report from every site in the same format, and a searchable history by project. When a client asks what happened on a given day, the answer is a search, not a hunt through notebooks.
What licences does it need?
On SharePoint lists and libraries with standard connectors, the app is a Standard app under most Microsoft 365 business plans, according to Microsoft's page on app license designation (checked November 2026). Producing the PDF can use standard Microsoft 365 actions with some design work. A paid document connector makes it simpler but can make the flow premium, so decide early.
Frequently asked questions
Can it work without signal on site? It can be built to work offline in the Power Apps mobile app, with conditions set out in How to Build an Inspection App in Power Apps.
Can several people add to the same report? Yes. The site manager owns the report, and foremen or engineers can add their sections and photos before it is submitted.
Can the client see the reports? You can email the PDF to the client, or share the project folder with them as guests in Microsoft 365. They don't need the app.
How is this different from the inspection app? The inspection app records checks against a fixed list, such as a scaffold or a vehicle. The daily report records what happened on site that day. Many contractors use both.
Getting it set up
The construction and contractors page shows how daily reports fit with inspections and safety reporting. If you want to talk through how site reporting works for you today, book a 30-minute call.