Skip to content

Power Apps Examples: 18 Apps Businesses Actually Run

Most Power Apps examples online are demos. These are the everyday apps businesses run on Microsoft 365, grouped by the kind of work they replace, each with a guide to how it is built.

| 5 min read

Six rounded tiles with a checklist, a checkmark, a wrench, a box, a calendar and a clipboard, the checkmark tile highlighted

The most useful Power Apps examples are small apps that replace one everyday process: an inspection checklist on a phone, a request that needs approval, a stock count, or a timesheet. Each one pairs a Power Apps screen with a list of records and a Power Automate flow for reminders and sign-offs, on the Microsoft 365 the business already uses.

Here are 18 of them, grouped by the kind of work they replace. Each links to a guide on how it works. Four are written up as case studies from projects I delivered.

Checks and inspections

Apps that replace a clipboard. Staff work through a checklist on a phone, take photos of anything wrong, and the problem reaches the right person straight away.

Example What it replaces Guide
Site and equipment inspections Paper forms typed up later Inspection app with photos and offline use
Container damage inspections Photos shared on personal phones Case study
Daily vehicle checks Walk-around sheets left in the cab Vehicle inspection checklist app
Restaurant opening and temperature checks Paper sheets on a clipboard Restaurant checklist app
Clinic equipment checks A maintenance spreadsheet Clinic equipment checks
Hotel housekeeping Room sheets and phone calls to reception Housekeeping checklist app

Requests and approvals

Apps where someone asks for something and someone else says yes or no. Power Automate sends the approval, reminds people who don't answer, and keeps the record.

Example What it replaces Guide
Purchase and spend approvals Requests stuck in an inbox Approval flow with reminders
Expense claims Receipts emailed to finance Expense approval system
Leave requests Email and a shared calendar Leave approval in Teams
Access requests IT tickets with no approver Access request automation
Supply requests between branches WhatsApp orders Branch supply requests

Jobs and field work

Apps for people who are not at a desk. They see their own jobs, record what they did, and the office sees it the same day.

Example What it replaces Guide
Work orders Paper job sheets Work order system
Maintenance requests Phone calls to reception Maintenance request system
Construction timesheets Paper timesheets Timesheet app
Daily site reports A diary written from memory Site report app

Records and registers

Apps that keep track of things, people and dates, and warn you before something runs out or expires.

Example What it replaces Guide
Stock counts and reorder alerts Counting sheets and guesswork Inventory app
Equipment and asset tracking Nobody knowing who has the drill Asset tracking with QR codes
Staff certification expiry A spreadsheet of dates Certification reminders

Others in the same family: visitor sign-in, volunteer records, employee onboarding, and incident reporting for clinics and HSE teams.

What do these examples have in common?

Three parts each. A list of records, usually a SharePoint list or Dataverse table. A Power Apps screen where people add and update those records, often on a phone. And Power Automate flows that move the work along: approvals, reminders, escalations and reports. Once you see that pattern, most paper forms and shared spreadsheets in a business look like candidates.

Which example should a business start with?

The process everyone complains about, not the biggest one. A good first app has one team, one clear owner and a pain people feel every week. Approvals are often the quickest win, which is why a single sign-off flow is a fixed price from $1,800 and goes live in two to three weeks.

Frequently asked questions

Are these real apps or templates? They are the kinds of apps businesses run every day. Four are case studies from my own projects, and the guides explain how each type is built, with the design choices that matter.

Can I download these as templates? Microsoft publishes some sample apps inside Power Apps. A template rarely fits your process as it stands, though, and adapting one can take as long as building the screens you need.

Do all of these need premium licences? No. Most run on SharePoint lists with standard connectors, which most Microsoft 365 business plans cover. How Much Does a Power App Cost? explains when they don't.

Can one app do several of these? It can, but it is usually better as separate small apps on shared data. They are easier to change, and a problem in one doesn't stop the others.

Find the one for your business

The industries pages group these examples by sector. If you want to know which one would save your team the most time, book a 30-minute call.

Last updated

Working through this on a real project?

30 minutes, no cost, no pitch. Describe what you are building and I’ll tell you what I would do.